Mon to Fri, 7:00am to 5:00pm
Call (208) 675-9470
Wood-look plank flooring running through a white shaker kitchen remodel
Listed on Google under Kitchen remodeler and Remodeler and Bathroom remodeler.

Install flooring in Boise, Idaho

New floors matched to the cabinets and counters you chose, with the tear out and any subfloor repair handled by the same crew.

About this service

Install flooring, the DH Homes way

Flooring on a DH Homes project starts before the new floor goes down. We pull the old floor, check the subfloor, and fix what we find, which in older Boise houses and around bathroom fixtures is often more than the homeowner expected. Then the new floor goes in, matched to the cabinets and counters you already chose, and tied into the rest of the house so the transition does not announce itself.

We install flooring for the kitchens, bathrooms, living areas, and additions we remodel. One crew handles the demo, the subfloor, and the finished floor, which keeps the schedule tight and means the person laying the floor knows exactly where the cabinets will sit.

Schedule a Consultation
Light oak plank flooring running through a remodeled black cabinet kitchen
What is included

What we handle, and what you can expect.

Tear out and subfloor

Removing the old floor, inspecting the subfloor, and replacing rotted or damaged sections before anything new goes down.

Hard surface flooring

Luxury vinyl plank, engineered and solid hardwood, and laminate, laid to run cleanly from room to room.

Tile

Porcelain and ceramic floor tile for kitchens, bathrooms, and mudrooms, including large-format tile and patterns like herringbone.

Transitions and base

Thresholds, transitions to existing flooring, and new base so the edges are finished, not covered.

Questions

Install flooring questions, answered.

The things Boise homeowners ask us most about this part of a project. More on the FAQ page.

Can you replace just the flooring in my kitchen?

We install flooring as part of our remodels. If the kitchen is otherwise staying, a flooring company will be a better fit. If the floor is one piece of a larger kitchen or bathroom project, it is included.

What if my subfloor is damaged?

We fix it before the new floor goes down. One of our bathroom clients had a fully rotted subfloor; we replaced it and kept the project moving. We will show you what we find and price the repair before doing it.

Should the floor go in before or after the cabinets?

It depends on the flooring. We plan the sequence for each project so the finished floor and the cabinet install work together and nothing gets damaged.

Homeowner review

From a DH Homes client on Google

★★★★★
DH Homes came in and revamped my bathroom. They were meticulous, careful and the thorough with my bathroom remodel. My sub floor was completely rotted out and they replaced it fast so they could move on with the job. They then put the new tub in, the floors, followed by the vanity and tile for the shower wall. Every time I walk into that bathroom I have a DH (Dazzling high) smile. Couldn't be happier with how things turned out, and the price was more than reasonable.
Mike Delyea, Google review
Service area

Install flooring across the Treasure Valley

Based in Boise, and working in these cities.

Schedule a consultation

Talk to us about new flooring for your home.

Start with a walkthrough. We look at the space, talk through what you want and what you want to spend, and come back with a plan before anything is torn out.

Prefer to talk? Call (208) 675-9470 or email chris@dhhomesboise.com. Office hours are Monday to Friday, 7:00am to 5:00pm.

Contact form

Prefer to talk? Call (208) 675-9470.